hello@fspslimited.co.uk

03330 015 6633

St Thomas A Beckets School Wakefield

We were asked to create a light and airy reception area and to provide an extra layer of safety and security for the staff working on reception. We removed the existing reception desks and raised the platform to give us the blank canvas we needed. We designed a bespoke joinery

Read More »

St Joseph’s Primary School Pontefract

This playground had been unused by the school for over 2 years due to the dangerous state of the rubberized surface which had started to delaminate and lift creating several trip hazards. They asked us tocome up with a cost-effective solution to return this to a safe, usable area for

Read More »

St Joseph’s Primary School Castleford

The school had a specific issue that needed a fast and effective solution. Children were falling and hurting themselves on an old uneven rockery and large unsafe border kerbstones. We were contracted to carryout the works within half term to keep any possible disruption to a minimum. First job was

Read More »

St Benedicts Primary School Garforth Leeds

We were contracted to carry out the full refurbishment of the school’s old kitchen and had 2 weeks to complete the project and hand back a fully functioning kitchen. Project management software was used to ensure each aspect of the project was planned perfectly to maximize the tight deadline. The

Read More »

Airex Pension Scheme

The wall had been made incredibly unsafe by several large trees growing at the base of the wall and making it structurally unstable. Making the wall safe was a priority as it bordered a public car park. We removed all the trees, shrubs, and bushes from around the car park

Read More »

Ainleys Insurance

We were contacted by existing client Ainleys Insurance to provide safety screens for their staff in order tohelp facilitate a safe return to work during the Covid 19 pandemic. We designed and installed matching glass screens at both locations. The screens have a postal cut outsection to allow documents to

Read More »

Advantage Property Lawyers

This project was a total rip-out, refurbishment, and fit-out of a 6000sq office space. It included the strip outof the whole first floor, removal of parquet flooring, all electricals, lighting, gas central heating, and allplumbing. The toilet blocks and kitchen areas were demolished along with partition walls and suspended ceilings

Read More »