We were contracted to carry out the full refurbishment of the school’s old kitchen and had 2 weeks to complete the project and hand back a fully functioning kitchen.
Project management software was used to ensure each aspect of the project was planned perfectly to maximize the tight deadline. The contract included the removal of all existing fixtures, fittings, and flooring leaving us with a totally blank canvas. The walls were dry-lined and then fitted with white PVC Rock Boards creating a bright hygienic surface.
We created a new, much-needed, drainage channel on the floor and applied a new screed which was then covered with a hardwearing vinyl safety flooring. The existing wooden kitchen window was rotten and unhygienic so it was replaced with a brand new white UPVC window and a hygienic fly screen.
Finally, we prepared and decorated all woodwork in hardwearing gloss, leaving the kitchen ready for the new equipment to be fitted.
We delivered the kitchen refurbishment on time and on budget